ACCESS TO SITE
“WORK RESTRICTIONS”
PART 1 - GENERAL
1.01 DESCRIPTION
A. General:
1. Designation to the access to site
2. Site working space
B. Related Work Specified Elsewhere:
1. Conditions of contract: Quality of materials and workmanship
and tests.
1.02 LOCATION AND
BOUNDARIES OF SITE
The contractor during the performance of this contract, will be
restricted to the use of the work site, haul roads and assigned housing and
messing storage and laydown areas assigned by the Owner. The contractor shall
comply with national standards and conditions for construction and use of site
offices work site and laydown areas.
The location of those parts of the site allocated for the
permanent works together with all boundaries are shown on the site plan
included with the contract drawings. The contractor is advised to ascertain
this area during his site visit and he shall take such measures given within
these conditions and exercise such care as to protect this area and boundaries
during the course of the works and as may be directed by the Engineer.
The contractor shall erect, adapt and maintain and clear away
temporary fencing consisting of tow meters high chain link with posts and
access gates as may be required to enclose the permanent works as shown on the
site plan and all other areas allocated by the Engineer from time to time. The
contractor shall not allow his workmen or any other person to pass beyond the
limits of the site other than for the purpose of access.
1.03 ACCESS TO SITE
Within the Owner lands, the Owner shall designate the access and
the contractor shall maintain temporary access roads in order not to damage the
permanent roads. The contractor shall be entirely responsible for the provision
of any sign or direction on any such route that he may consider necessary for
the guidance of his staff, Workmen and visitors, for obtaining permission that
may be required from any authority for the use of such or the provisions of
such signs or directive.
1.04 SITE WORKING SPACE
The
contractor shall take note of the area for building operations available within
the site area and shall confine his apparatus storage lots of materials, and
operations of his workforce within those confines and to the direction of the
Engineer and shall not unreasonably encumber the site with untidy material.
The
contractor shall allow site areas for sub-contractor use and shall be
responsible for his obligations upon such sub-contractors.
1.05 STAGING
AREAS
The
contractor will not be allocated staging areas outside the site boundaries.
PART 2 - PRODUCTS
NOT USED
PART 3 - EXECUTION
NOT USED